Snow piles block Vassar St roadway
Heard on: Middlesex MA Public Works Group Calls
00:18
00:00
(name withheld), (name withheld) had called about (number withheld) Vassar Street.
Not official report. AI-generated from public dispatch audio. Always verify with official sources.
As discussed during the dispatch call, a report indicated a possible road blockage near Vassar Street caused by snow piles connected to MIT property. The piles were not part of city snow removal operations, and MIT was expected to handle the issue.
Help the community verify
Is the summary accurate?
Accurate
Unclear
Is this activity real?
Confirmed
False alarm