Snow removal prompts lane closure on bridge
Heard on: Rockland NY Multi-Dispatch Group Calls
00:16
00:00
We're now doing a movable right lane, two lane closure northbound from mileposts two to seven for snow removal from (place withheld).
Not official report. AI-generated from public dispatch audio. Always verify with official sources.
As discussed during the dispatch call, crews are conducting snow removal on the bridge, leading to a movable two-lane closure northbound between mileposts 2 and 7. Traffic delays may occur until the operation is complete.
Help the community verify
Is the summary accurate?
Accurate
Unclear
Is this activity real?
Confirmed
False alarm
